Skip to main content
Schedule a demo

Canvas delivers content.Delphinium delivers Engagement!

Delphinium transforms the Canvas courses you already teach into engaging student experiences and an early-warning system for parents and teachers. No migration. No extra work. Just turn it on.

Cut failures, up to31%!
  • Go live in less than 3 minutes. Keep Canvas, enhance with Delphinium.
  • Zero learning curve. Teachers keep using Canvas exactly as before.
  • Built on science. 14 years of published behavioral research.

The hidden costs

Education moved online, Engagement didn't follow.

In a classroom, teachers can read the room, catch a glance, and stand by the student who is drifting. None of that survives the move to a screen.

When engagement breaks down...

Attendance

1 in 4

students are chronically absent, still elevated years after the shift online.

RAND / Return to Learn Tracker, 2024-25

Achievement

1 in 3

students score below grade level. The lowest performers keep losing ground.

The Nation's Report Card (NAEP), 2024

Cost

$229K

the cost of a K-12 education and lost potential when students don't finish.

U.S. Census Bureau, FY2024

Three crises, one cause: disengagement. Doing nothing is the most expensive option you have.

Canvas knows who's falling behind. It just won't tell you.

Every missed login, late assignment, and skipped module is a warning sign. Canvas records all the signals, then scatters them across pages nobody has time to read. By the time a struggling student shows up in the gradebook, the window to help them has often already closed.

  • Invisible until it's too late

    Struggling students rarely speak up. They go quiet, one missed assignment at a time, until they're too far behind to catch up.

  • Thirty messages, one at a time

    Every check-in is written by hand, one student at a time. So most of the messages that could save a student never get sent.

  • Detective work, not teaching

    You get hours of digging through gradebooks and reports, paid for with nights and weekends instead of time with students.

  • Parents in the dark

    Parents want to be the coach in their kid's corner, but most find out they're struggling after it's too late.

Stop hunting for struggling students, Delphinium brings them to you.

Control Tower

See everything, Act in seconds.

Delphinium pulls all of Canvas's scattered data into one clear view, so teachers see who needs support at a glance, and can reach out in seconds.

  • Turn Canvas into an early-warning powerhouse
  • Red, yellow, and green reveal who needs help first
  • One click gives the full picture: grades, progress, missing and late work, and more!
  • Send mass messages to parents
Control Tower roster: every student in a row with grade, points, and green, yellow, or red activity and status flags.
Student detail panel showing grades, progress, observers, and engagement counts for past due, missing, and late work.

“I can see, with color, my students' progress – see their points, their percentages… to tell me where a student is very quickly. This has saved most of my Saturday nights!”

Natalie NiederhauserHigh School Math Teacher, Davis Connect

Community Builder

The right nudge, Right on time.

Stop blasting the whole class. Target exactly the students who need to hear from you, with exactly the right information – automatically. And include their parents too!

Right message, right person

  • Message one student, a group, or the whole class
  • Trigger outreach automatically from performance data
  • Automatically personalize with students' data
  • Keep parents in the loop with a single click
  • Auto-translate into 240160 languages

Less work, wider reach

  • Schedule messages to arrive at just the right time
  • Progress reports and reminders that send themselves
  • Start from a saved template, or let AI draft for you
  • One message, six channels: Canvas, personal email, SMS, etc.
  • One history of who was told what, and when

“You just saved me hours of mail merging! This saves teachers so much time and really brings that part of personalized learning that we all strive to reach.”

Sarah RuizCurriculum Director

“We can send targeted communication to specific groups of kids – and the data shows us exactly who those kids are.”

Ryan HansenDigital Learning Director

Early intervention for every at-risk student. Do more, in less time.

Engagement Builder

Which class would YOU rather finish?

For online students, Canvas is school, and too often it looks too often looks like a gray wall of text.

CanvasUnit 5: Nuclear ChemistryUnderstand the role of the nucleusNuclear Chemistry OverviewNuclear Chemistry PPT NotesCalculatingHalfLife.pdfNuclear Chemistry Assignment65 ptsNuclear Chemistry40 ptsCalculatingHalfLifeKey.pdfNuclear Chemistry Unit 5 Quest65 pts
Canvas + Delphinium!The same kind of Canvas course with Delphinium on: a course home with teacher photo, a countdown to the last day to submit, and color-coded weekly unit cards with progress bars.

Clear progress. Real wins.

When it's hard to see progress and what's next, students fall behind without realizing it. One missed assignment becomes three, grades start to slip, and by the time a student realizes they're behind, catching up feels out of reach.

With Delphinium, students can see at a glance what's done, what's in progress, and what comes next, so they own the journey. And parents get the same view! Turn parents from frustrated bystanders into the support system every student needs.

“If you ask kids, they don't like Canvas. It's basic… it needs something else to engage…”

Ryan HansenDigital Learning Director

“I was sitting on the couch watching Netflix and the thought popped into my head: I could be doing homework right now, and I did!”

Delphinium student survey response

Nobody quits when they're winning.

Every app on a student's phone is designed to capture their attention. Delphinium brings that same science of engagement into Canvas, so students build toward mastery instead of watching their grade slip away. Those apps took years to build. Adding Delphinium only takes minutes.

Engagement Builder widgets: Who's Near Me alias leaderboard, prize boxes, an avatar, a percent-complete gauge, a performance ring, and achievements.
Who's Near Me alias leaderboard, prize boxes, and a student avatar.Percent of assignments complete gauge, performance ring, and achievements.

Delphinium automatically creates success signals and milestones from the course you've already built. And teachers can always customize every piece.

  • Progress they can feel – Color-coded trackers count every point earned
  • Always a next step – Students know what's done, what's due, and where to go
  • Encouraging success signals – Avatars, prize boxes, achievements, celebrations, and more
  • Learning WITH others – Anonymous and optional comparison and competition build community
  • Urgency students can see – Nudges keep "I'll do it later" from turning into "I forgot"

“Our students absolutely love the interactive elements where they earn points to enhance their avatars and unlock prize boxes.”

“We have had students redo a quiz that they did poorly on to earn more points so they could just earn googly eyes for their avatar!”

Tiffany DanceInstructional Coach

See who's using Delphinium

Trusted by schools like yours.

  • Davis School District
  • Utah Virtual Academy
  • Baker Web Academy
  • Partner school logo
  • Kelsey Peak
  • Rocky Peak
  • AHS
  • Mewa
  • VPW

The full story

Hear it from educators Who use Delphinium every day.

Digital Learning and Curriculum Directors
Teachers and Instructional Coaches

Proof

Years of research behind every design decision.

Long before Delphinium was a product, its founders were researchers, studying what actually drives students to engage, and publishing what they found. Every engagement principle in the platform is grounded in peer-reviewed research, built on decades of work by the field's leading scholars.

  • Peer-reviewed14 yrsof published research behind the platform
  • Publications10peer-reviewed studies & book chapters
  • Cited by the field230+citations by other researchers

The Davis Connect study

31%

decrease in course failure rates.

Davis School District, Utah. 72 online classes and 6,000 students.

The courses didn't change. The teachers didn't change. Engagement did, and so did the outcomes.

More motivation

72%

of students say a Delphinium course is more or much more motivating than a traditional Canvas course.

In their words

“Fun.”

One of the most common words used when we ask how a Delphinium course is different.

Delphinium is built on three proven theories of student engagement

  • Self-regulated learning

    When students have the right information, they can set meaningful goals, monitor their progress, and reflect on what's working, adapting and driving their own learning.

    In Delphinium

    • Students see their progress, performance, and priorities at a glance
    • Progress updates create a feedback loop students use to adjust and improve
    • A clear view of the whole journey helps students set goals and take ownership
  • Behavioral economics (Nudge theory)

    When next steps are clear, timely, and easy to act on, students are more likely to follow through and build momentum toward success.

    In Delphinium

    • Clear visual cues make priorities and next steps easy to follow
    • Timely nudges prompt action before students fall behind
    • Celebrations and success signals reinforce momentum and persistence
  • Social presence

    When students feel seen, connected, and supported, they are more likely to engage, participate, and persist.

    In Delphinium

    • Personalized outreach helps students feel seen and valued
    • Students feel the class moving around them and know they're not alone
    • Teachers reach the right student at the right moment, before silence turns into withdrawal

Easy to deploy

Teachers and content don't change, Engagement does.

Lightning fast setup

Go live in less than three minutes. Delphinium adds a layer over the Canvas courses you already have and builds itself from your existing content. You keep Canvas, just enhanced, with no migration, no rebuild, and no new platform.

Zero learning curve

Teachers keep using Canvas exactly as before. Edits in Canvas flow through automatically. Teachers do not learn a new tool. And because every course shares the same layout, students can navigate all their classes with ease.

FERPAHECVATWCAG 2.1 Level AALTI 1.3US-hosted on AWS

Your schoolprogram already runs on Canvas Make it work harder for you

Your turn

See Delphinium on one of your Canvas courses.

Meet Dr. Jared R. Chapman, the researcher behind Delphinium. See how it will work in your Canvas courses and get your questions answered.

Schedule a demo with Jared

You're invited

Delphinium + your Canvas courses

Dr. Jared R. ChapmanThe researcher behind Delphinium

Good to know

  • No migration to plan
  • Nothing to install before the call
  • You stay in Canvas
Bring your questions!
Skip to main content

The face of the moon was in shadow

Almost before we knew it, we had left the ground. All their equipment and instruments are alive.Mist enveloped the ship three hours out from port. The spectacle before us was indeed sublime.A red flair silhouetted the jagged edge of a wing.

Get in touch.

Send us a note and we'll get back to you.

Only if your note is about a specific course.

Support

Send a ticket and we'll get back to you.

Required. N/A is allowed.

Attachments

Up to 5 files, 20 MB each.